GBARAN SOS

Scope Of Work

Phase 1

  1. Installation of reciprocating pumps and all related works
  2. Pipe Modification works for the XHP1 and XHP2
  3. Installation of temporary metering unit
  4. Integration works for temporary pumps to existing automation system
  5. Modification of the Booster Compressor Field Aux. Room to accommodate the new I/Os

Phase 2

  1. Installation of new Electric Driven Centrifugal Pumps.
  2. Installation of Fixed Metering System
  3. Installation of Corrosion Inhibitor Packages
     
Client SPDC
Site Gbaran
Project Description Gbaran Supply of Security
Scope of Work

To secure gas supply contract to NLNG in the event of TNP outage

To enhance Environmental performance

Support Goal ZERO

Actual Progress 55%
Total Amount (USD) Not disclosed

 

Scope Of Work

Phase 1

  1. Installation of reciprocating pumps and all related works
  2. Pipe Modification works for the XHP1 and XHP2
  3. Installation of temporary metering unit
  4. Integration works for temporary pumps to existing automation system
  5. Modification of the Booster Compressor Field Aux. Room to accommodate the new I/Os

Phase 2

  1. Installation of new Electric Driven Centrifugal Pumps.
  2. Installation of Fixed Metering System
  3. Installation of Corrosion Inhibitor Packages

Alcon Nig Ltd

Head Office - Port Harcourt

Contact

HEAD OFFICE:
ALCON NIGERIA LIMITED
Plot 17 Trans-Amadi Industrial Layout
Port Harcourt, Rivers State, NIGERIA.
Phone: +234 802 054 4960
E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
Website: www.alcon-nig.com

© 2013-2020 Alcon Nigeria Ltd. All Rights Reserved.