Alcon Projects

Completion and Commissioning of FYIP-CPF/CCP Plant & North Bank Flow Station.

Addendum to Section IV (B) Scope of Work (FYIP New Onshore Scope - Phase II)

 

SCOPE OF WORK:

The work scope entails completion of outstanding work items before contractor was temporarily demobilized from site, remedial works as a result of the site abandonment, punchlist items from inspections, punchlist items from pre-startup audits, any other identified work items, and commissioning of the facilities. In summary, the work scope is to complete all works necessary and incidental to the completion, commissioning and handover of the facilities to Operations.
 

SCOPE OF WORK

Construction of main terminal building, APRON, road network, parking and walkways.

NEW INTERNATIONAL AIR PASSENGER TERMINAL BUILDING (approximately 14.000 sqm)
  •   ACCOMODATE AND OPERATE 5 STANDARD JET WAYS
  •   3 COMPLETE TERMINAL FINGER SYSTEMS
  •   1 TERMINAL DOOR TO BE EQUIPPED FOR VIP PLANES
  •   1 OPTIONAL COMPLETE TERMINAL SYSTEM FOR AIRBUS 380
LAND SIDE
  •   ACCESS ROAD NETWORK (approximately 32.000 sqm.)
  •   CAR PARK SYSTEM (approximately 10.000 sqm.)
TRAFFIC
  •   MAXIMUM AIR PASSENGER TRAFFIC: 1.50 Million passengers per year
  •   TYPICAL PEAK HOUR PASSENGERS: 750 passengers
APRON (approximately 35.000 sqm) 
  •   NOT INCLUDING RUNWAY CONNECTION TAXIWAYS
  •   AIR-SIDE FIXED FITTINGS AND EQUIPMENT.

SUBSTATION COMPLETION UPGRADE AND POWER DISTRIBUTION FOR UYO AIRPORT

 

SCOPE OF WORK:

Engineering Design, Procurement, Installation and Commission of the Uyo Airport Power Substation as well as the Main Airport Distribution Ring System.


 

CLIENT

AKWA IBOM STATE

Site

Uyo, International Airport, Akwa Ibom, State

Project Description

SUBSTATION COMPLETION UPGRADE AND POWER DISTRIBUTION FOR UYO AIRPORT

Scope of Work

Provision of Technical personnel, equipment and materials for the substation completion upgrade and power distribution.

Actual Progress

83%

 

Total Amount (USD)

 $12,500,000.00

 

POWER DISTRIBUTION - AKIA PROJECT - PHOTO GALLERY

{phocagallery view=category|categoryid=17|}

 

Akwa Ibom State International Airport (Phase I-B)

 

Scope of Work

Construction of the National Hangar/Maintenance, Repair, Overhaul (MRO) facility which will allow for maintenance checks and overhaul of commercial aircraft up to and including 'D' checks. The Hangar will accommodate two 747-400 aircraft, parked side-by-side, nose-in, fully contained within the building. The Hangar clearance, arrangement, and support shops allow flexibility for servicing a wide range of aircraft both in Africa and abroad.

 

EPCC of RA Type 3 Apartment- Phase 1

SCOPE OF WORK:

The scope of work for the EPC of RA Type 3 Apartment- Phase 1 Project are as follows:

• Construction of 12 units of 3 floor apartment blocks, which consists of six – 3 bedroom building , two each floor;

• Associated infrastructure including underground services (power, telecom, potable water, waste water, fire water and fire alarm);

• Roads and car parks;

• Storm drainages;

• Street lightings;

• Landscaping;

• New water tank;

• Power substation and

• Centralized air conditioning chiller plant.

Alcon Nig Ltd

Head Office - Port Harcourt

Contact

HEAD OFFICE:
ALCON NIGERIA LIMITED
Plot 17 Trans-Amadi Industrial Layout
Port Harcourt, Rivers State, NIGERIA.
Phone: +234 802 054 4960
E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
Website: www.alcon-nig.com

Alcon Cloud

© 2013-2020 Alcon Nigeria Ltd. All Rights Reserved.