Welcome to Alcon!

  • About us

    Who is Alcon?

    EPC Contractor in the Upstream, Midstream, Downstream, Power Systems and Infrastructure for projects with individual value of up to 250 MUSD. P&C Contractor for projects up to 400M USD.

     

     

    Alcon's Read More

  • Alcon News

    Alcon's most recent news! Read More
  • Under Execution Projects

    Alcon's current projects:
    Akia Phase II
    PH Monorail
    Nun River Project
    Soku Project
    Okoloma Project
    Bonny RA Project
    Forcado Yokri Project
    Read More
  • Finalized Projects

    A brief presentation of major Alcon's executed projects. Read More
  • CSR

    CORPORATE SOCIAL RESPONSIBILITY (CSR) POLICY

    ALCON  believe the principles of corporate social responsibility (CSR) and good corporate citizenship are key to our success. Our CSR stance focuses on four key areas : Client and marketplace

    Read More
  • 1
  • 2
  • 3
  • 4
  • 5

Traverser Installation Success

Traverser Installation Success

On 21st of November, Alcon succesfully installed the traverser beam. The installation of the 96 Tons and 50 meters traverser was a a major milestone on the road to successful project completion.

See below a gallery of photos from the installation.

Installation of Free Issue Monorail Track work and Associated Items

 

SCOPE OF WORK:

The complete scope of work on the Rivers Monorail Project with regards to the assembly and installation works includes the guideway (also called track beams), depot, stations and electrical power rooms.

The guideway installation on the Rivers Monorail Project consists of approximately 6.5km double track which are divided up into two phases namely phase 1A and Phase 1B. Phase 1A consists of 2.6km single track from the depot (just south of Lagos bus stop) up to UTC Junction station. Phase 1B consists of 2.6km additional single track between the Depot and UTC Junction station and 3.9km double track from UTC Junction station up to Waterlines Station.

Read more...

Completion and Commissioning of FYIP-CPF/CCP Plant & North Bank Flow Station.

Addendum to Section IV (B) Scope of Work (FYIP New Onshore Scope - Phase II)

 

SCOPE OF WORK:

The work scope entails completion of outstanding work items before contractor was temporarily demobilized from site, remedial works as a result of the site abandonment, punchlist items from inspections, punchlist items from pre-startup audits, any other identified work items, and commissioning of the facilities. In summary, the work scope is to complete all works necessary and incidental to the completion, commissioning and handover of the facilities to Operations.
 

EPIC Development of Outstation Accomodation at NUN River

EPIC Development Outstation Permanent Accommodation at Nun River

 

SCOPE OF WORK:

Building Construction; Equipment Supply & Installation; Infrastructural / External  Works Construction of Remote Secure and Complete recommendation facilities for SPDC

Read more...

Akwa Ibom State International Airport - AKIA (Phase II)

 

SCOPE OF WORK:

Construction of main terminal building, APRON, road network, parking and walkways.

NEW INTERNATIONAL AIR PASSENGER TERMINAL BUILDING (approximately 14.000 sqm)
  •   ACCOMODATE AND OPERATE 5 STANDARD JET WAYS
  •   3 COMPLETE TERMINAL FINGER SYSTEMS
  •   1 TERMINAL DOOR TO BE EQUIPPED FOR VIP PLANES
  •   1 OPTIONAL COMPLETE TERMINAL SYSTEM FOR AIRBUS 380
LAND SIDE
  •   ACCESS ROAD NETWORK (approximately 32.000 sqm.)
  •   CAR PARK SYSTEM (approximately 10.000 sqm.)
TRAFFIC
  •   MAXIMUM AIR PASSENGER TRAFFIC: 1.50 Million passengers per year
  •   TYPICAL PEAK HOUR PASSENGERS: 750 passengers
APRON (approximately 35.000 sqm) 
  •   NOT INCLUDING RUNWAY CONNECTION TAXIWAYS
  •   AIR-SIDE FIXED FITTINGS AND EQUIPMENT.

Read more...