Welcome to Alcon!

  • About us

    Who is Alcon?

    EPC Contractor in the Upstream, Midstream, Downstream, Power Systems and Infrastructure for projects with individual value of up to 250 MUSD. P&C Contractor for projects up to 400M USD.

     

     

    Alcon's Read More

  • Alcon News

    Alcon's most recent news! Read More
  • Under Execution Projects

    Alcon's current projects:
    Akia Phase II
    PH Monorail
    Nun River Project
    Soku Project
    Okoloma Project
    Bonny RA Project
    Forcado Yokri Project
    Read More
  • Finalized Projects

    A brief presentation of major Alcon's executed projects. Read More
  • CSR

    CORPORATE SOCIAL RESPONSIBILITY (CSR) POLICY

    ALCON  believe the principles of corporate social responsibility (CSR) and good corporate citizenship are key to our success. Our CSR stance focuses on four key areas : Client and marketplace

    Read More
  • 1
  • 2
  • 3
  • 4
  • 5

Akwa Ibom State International Airport - AKIA (Phase II)

 

SCOPE OF WORK:

Construction of main terminal building, APRON, road network, parking and walkways.

NEW INTERNATIONAL AIR PASSENGER TERMINAL BUILDING (approximately 14.000 sqm)
  •   ACCOMODATE AND OPERATE 5 STANDARD JET WAYS
  •   3 COMPLETE TERMINAL FINGER SYSTEMS
  •   1 TERMINAL DOOR TO BE EQUIPPED FOR VIP PLANES
  •   1 OPTIONAL COMPLETE TERMINAL SYSTEM FOR AIRBUS 380
LAND SIDE
  •   ACCESS ROAD NETWORK (approximately 32.000 sqm.)
  •   CAR PARK SYSTEM (approximately 10.000 sqm.)
TRAFFIC
  •   MAXIMUM AIR PASSENGER TRAFFIC: 1.50 Million passengers per year
  •   TYPICAL PEAK HOUR PASSENGERS: 750 passengers
APRON (approximately 35.000 sqm) 
  •   NOT INCLUDING RUNWAY CONNECTION TAXIWAYS
  •   AIR-SIDE FIXED FITTINGS AND EQUIPMENT.

Read more...

Substation Completion Upgrade and Power Distribution for Uyo Airport

SUBSTATION COMPLETION UPGRADE AND POWER DISTRIBUTION FOR UYO AIRPORT

 

SCOPE OF WORK:

Engineering Design, Procurement, Installation and Commission of the Uyo Airport Power Substation as well as the Main Airport Distribution Ring System.


 

CLIENT

AKWA IBOM STATE

Site

Uyo, International Airport, Akwa Ibom, State

Project Description

SUBSTATION COMPLETION UPGRADE AND POWER DISTRIBUTION FOR UYO AIRPORT

Scope of Work

Provision of Technical personnel, equipment and materials for the substation completion upgrade and power distribution.

Actual Progress

83%

 

Total Amount (USD)

 $12,500,000.00

 

POWER DISTRIBUTION - AKIA PROJECT - PHOTO GALLERY

1
1
2
2
3
3
4
4

 

Akwa Ibom State International Airport (Phase I-B)

 

Scope of Work

Construction of the National Hangar/Maintenance, Repair, Overhaul (MRO) facility which will allow for maintenance checks and overhaul of commercial aircraft up to and including 'D' checks. The Hangar will accommodate two 747-400 aircraft, parked side-by-side, nose-in, fully contained within the building. The Hangar clearance, arrangement, and support shops allow flexibility for servicing a wide range of aircraft both in Africa and abroad.

 

Read more...